
Multi-modal Transport
Fast-track links that pair high-speed roadways with metro/BRT ribbons, service roads and utility tunnels—designed to move people and freight seamlessly while minimising land-take.
Navghar – Balavali MMC (Phase-I) – 102 km access-controlled 4 + 4 / 6 + 6 lanes with a 26 m central metro reserve; DPR + LAQ package closed Jan 2022 — Client MSRDC
Chirner – Balavali MMC – 18 km 4 + 4 lane corridor with 30 m MRTS strip and full CRZ/forest clearances; DPR & pre-tender activities completed 2020 — Client MMRDA → MSRDC
NAINA-CIDCO MMC Feasibility – 25.7 km 4 + 4 expressway plus median metro and dual service roads; final techno-economic report delivered Dec 2014 — Client MMRDA
Extended MUIP Network (MMR) – 101.79 km of bypasses, link roads, 34 km viaducts and signature creek bridges supporting road–rail–port connectivity; DPR approved Jun 2014 — Client MMRDA
Eastern Freeway Interface (Panjarpol – CMLR) – 2.5 km elevated section integrating with planned metro/eastern freeway systems; design & pre-tender dossier finalised 2014 — Client MMRDA