
Metros
End-to-end advisory for city MRT systems—alignment surveys, geotech cores, LAQ, EIA/SIA and DPRs—so trains move on time and authorities clear tenders faster.
Assignments below span 20 km underground spurs to 100 km green-field corridors, proving multi-disciplinary depth.
Chennai Monorail Mass-Transit System – 57 km elevated network; full topographic & geotechnical survey, LAQ plans and EIA finished for bidding. Client – Metropolitan Transport Corporation (Chennai)
Nagpur Metro, Both Corridors – 44 km; bore-hole campaign and lab testing completed for viaduct and tunnel packages. Client – Maha-Metro (Nagpur)
Pune Metro NS-Corridor (Underground) – 20 km Agriculture College ↔ Swargate stretch; 2.9 km of cores, geotech report and variation justifications accepted Jul 2020. Client – Maha-Metro (Pune)
Bengaluru Metro Phase-3: JP Nagar 4th Phase → Kempapura – 32.15 km; environmental baseline, public-hearing docs & EMP submitted Apr 2025. Client – BMRCL
Bengaluru Metro Phase-3: Hosahalli → Kadabagere Spur – 12.5 km semi-ring link; EIA/EMP and mitigation cost-sheet delivered under same LoA. Client – BMRCL
Virar – Alibaug Metro (MMC Median) – 100 km access-controlled corridor with 26 m metro reserve; feasibility & DPR finished 2023. Client – MSRDC
Agra Metro LiDAR & Control Network – 20 km twin-line area flown; 3 cm GSD point cloud & DWG delivered, contract closed Mar 2023. Client – UPMRC
Chennai Monorail – Additional Link Study – Velachery ↔ Kathipara & Porur ↔ Arcot Rd connectors; alignment, utility mapping and real-estate potential report submitted Oct 2013. Client – MTC (Chennai)