top of page
High Speed Rail Corridor
Project Name:
Final alignment design including Aerial LiDAR Survey and other related works for Mumbai-Hyderabad High Speed Rail Corridor (about 711 kms. long)
Details:
Client: NHSRCL
Start Date: December 2020
End Date: September 2022
Services: Aerial LiDAR Survey

Description:
Monarch conducted the Aerial LiDAR Survey and related works for the final alignment design of the 711 km long Mumbai – Hyderabad High Speed Rail Corridor for NHSRCL. The project, executed from Dec. 2020 to Sept. 2022, provided high-precision geospatial data to support corridor planning and engineering design.
bottom of page
